News
Stornoway Water wins Rio Tinto extension contract
Posted on 09 June, 2009 in Stornoway Water News
Stornoway Water has been awarded a contract for the supply and installation of a Potable Water Treatment Plant and Sewage Treatment Plant for Rio Tinto’s Kestrel Coal Mine Expansion Project near Emerald in Queensland.
Rio Tinto had a very urgent requirement and Stornoway were able to provide a superior technical solution and an accelerated delivery program to meet their stringent specifications.
Stornoway will supply:
• AQEO 95kL/day Ultrafiltration (UF) Membrane Water Treatment Plant for Potable Water to the Australian Drinking Water Guidelines (ADWG).
• AQEO 30kL/day Membrane Bioreactor (MBR) expandable to 90kL/day Sewage Treatment Plant that will produce Class ‘A’ recycled water to Queensland EPA Guidelines.
This contract follows Stornoway’s previous contract for the supply and installation of a Sewage Treatment Plant at the Rio Tinto Clermont Coal Mine also in Queensland.
If we can assist you with your water or waste water treatment requirements, please do not hesitate to contact us.
Stornoway Water is able to provide detailed budget quotes in less than 48 hours.
Stornoway Water Pty Ltd
Phone: +61 7 3273 9500
Fax: +61 7 3277 7200
Mob: 0407 052 048
E-mail: .(JavaScript must be enabled to view this email address)
« Stornoway Water residential development MBR Stornoway Water in Malaysia »